DBE Certification NAICS Codes: Size Limits, Work Codes, Adding Codes

Which NAICS codes a DBE is certified in decides what work counts toward goals. Size limits per code, adding codes later, directory searches, and the 2025-2026 rule changes.

Excavator and traffic barrel at a roadway construction site
In this guide
  1. The program status in late 2026
  2. How certified NAICS codes work
  3. Size limits: a test for each code, plus a federal cap
  4. Choosing codes when you apply
  5. Adding a code later
  6. How prime contractors search by NAICS
  7. Worked examples
  8. Airport concessions (ACDBE)
  9. Sources

The U.S. Department of Transportation’s Disadvantaged Business Enterprise (DBE) program, governed by 49 CFR Part 26, does not certify a firm in general. It certifies the firm for specific types of work, and each type is identified by a NAICS code, sometimes narrowed by a written description. Those codes appear in your state’s Unified Certification Program (UCP) directory. They set the size limit your firm must stay under, and they decide which work a prime contractor can count toward a DBE goal. Work outside your certified codes does not count, even if your firm performs it well.

The program status in late 2026

Two DOT rules changed DBE eligibility. Together they make up the current text of Parts 26 and 23:

  • October 3, 2025: interim final rule (90 FR 47969), effective the day it was published. It removed the race- and sex-based presumptions of social and economic disadvantage. Every owner must now show disadvantage individually, with a Personal Narrative and a personal net worth (PNW) statement. UCPs had to reevaluate every firm already certified. Until a UCP finishes, the recipients it covers (state DOTs, transit agencies and airports) may not set DBE contract goals or count DBE participation toward goals (§§ 26.51(h) and 26.55(i)).
  • September 25, 2026: final rule (91 FR 60885), effective the same day. It keeps the interim rule’s framework with minor changes and sets deadlines. Each UCP must finish its reevaluations by December 24, 2026, with a one-time extension of up to 90 days if DOT grants one. A certified firm that has not filed its narrative and PNW statement by then gets a notice of nonresponse. It then has until March 24, 2027 to file, or 90 days after an extended deadline, before it is automatically disqualified.

For NAICS codes, the important point is this: a firm that passes reevaluation stays in the directory “without change,” so its existing codes carry over. New applications must still be accepted during reevaluation, and they are judged under the new standard. Some UCPs have finished their reevaluations and others have not, so goals may already be back in one state and still suspended in the next. Check with your UCP or DOT’s interim final rule page before you assume goals apply to a bid.

How certified NAICS codes work

Section 26.73 sets the rules:

  • A certifier may certify a firm only for types of work that the disadvantaged owner controls, not merely work the firm is able to do.
  • The correct code is the one that describes “as specifically as possible” the principal goods or services the firm would provide to DOT recipients. A firm can have several codes.
  • Everyone must use the plain meaning of the NAICS descriptions to decide what the certification covers.
  • If no code describes the work narrowly enough, the certifier must add a clear, specific narrative that supplements or limits the code. Vague descriptions are not enough.
  • A UCP may also use its own work codes, but these are extra labels. Under § 26.73(a)(5), they do not override or limit what a DBE is eligible for under its NAICS codes.

The counting rule depends on these codes. When a bidder lists DBEs to meet a contract goal, § 26.53 states that “each DBE firm must be certified in a NAICS code applicable to the kind of work the firm would perform on the contract.” The airport concession program has a matching rule in Part 23.

Size limits: a test for each code, plus a federal cap

DBE size is checked in two layers under § 26.65:

TestWhat is measuredLimitWhere it applies
SBA size standard for each NAICS codeReceipts averaged over the preceding five fiscal years (or employees, for employee-based codes), affiliates includedThe SBA standard for that code in 13 CFR 121.201All DBE certification
Statutory gross receipts capGross receipts averaged over the previous three fiscal years, affiliates included$32.82 million (DOT’s 2026 inflation-adjusted figure)FHWA- and FTA-assisted contracts; not FAA-assisted work
Personal net worthEach disadvantaged owner’s PNW$2,047,000All DBE and ACDBE certification

The regulation’s text still shows the March 2024 cap of $30.72 million and says DOT adjusts it each year and posts the current figure at transportation.gov/DBEsizestandards. Confirm the number there before you rely on it.

Because the SBA standard depends on the code, a firm can be small enough for one code and too large for another. On highway and transit work, whichever limit is lower controls:

CodeSBA standardLower limit on FHWA/FTA work
237310 Highway, Street, and Bridge Construction$45 million$32.82 million cap
484220 Specialized Freight Trucking, Local$34 million$32.82 million cap
541330 Engineering Services$25.5 million$25.5 million SBA standard
238910 Site Preparation Contractors$19 million$19 million SBA standard
541370 Surveying and Mapping$19 million$19 million SBA standard
561730 Landscaping Services$9.5 million$9.5 million SBA standard
423320 Brick, Stone, and Related Construction Material Merchant Wholesalers150 employees150 employees, and the $32.82 million cap also applies

Two details are easy to miss. The SBA standard and the federal cap use different averaging periods, five years and three years. Both also count affiliates, so a sister company’s receipts can push you over a limit. SBA size standards explained covers how receipts and affiliation are calculated. You also file a Declaration of Eligibility with your gross receipts every year, which gives certifiers the figures to check against each code’s limit.

Choosing codes when you apply

You apply through your home state’s UCP using the Uniform Certification Application. You describe your work and request codes, and the certifier checks them during an on-site review. That review, in person or virtual, includes an interview with the qualifying owner and key staff and a visit to an active job site if there is one. Under § 26.73(a)(3), you must give the certifier enough company information to assign the right codes.

To prepare:

  1. List the work you actually perform on DOT-funded jobs. Use bid items or scopes you have done, not general categories.
  2. Find the most specific code for each one. Use the code finder, and read each code’s description and examples. For construction trades, the construction business-type page shows how general contractor codes differ from specialty trade codes.
  3. Request only codes the qualifying owner controls. The certifier checks the owner’s experience, licenses, equipment and decision-making for each type of work.
  4. Expect a narrative where the code is broad. Explain in plain words what the firm does and does not do under that code.

A DBE can hold several codes. Can a business have more than one NAICS code explains primary and secondary codes in general. Here, every certified code is equally important, because each one opens a different category of countable work.

Adding a code later

When your firm takes on a new type of work, you can ask to be certified in it. Section 26.73(a) says that to add a type of work, the firm must show only that its disadvantaged owner controls the firm for that work. The certifier may not make you reapply or go through recertification, but it must verify control.

In practice, UCPs use their own request forms. Typical supporting evidence includes the owner’s résumé and experience in the new work, licenses, equipment lists, and invoices or contracts showing the work was done. Check the new code’s size standard first, because a firm under the limit for its current codes can be over it for the new one. If your UCP is still reevaluating firms, ask how it is handling requests to add codes in the meantime.

Codes can also be changed or removed. A certifier with a factual basis may change your classification or description after giving 30 days’ notice, and the change cannot be retroactive. A UCP that removes a single code must follow the decertification procedures of § 26.87.

How prime contractors search by NAICS

Under § 26.31, every UCP directory must list each firm’s certified work using the most specific NAICS code available. It must also be searchable online by location, NAICS code and work description, and it must carry a disclaimer that a listing does not guarantee the firm’s capacity. Recipients also collect the NAICS code for each scope of work a firm bids on, for their bidders lists.

A practical workflow for a prime contractor or estimator:

  1. Break the project into scopes, and find the NAICS code that matches each one.
  2. Search the UCP directory by that code and the project area.
  3. Read the narrative on each result. A code with a limiting narrative may not cover your scope.
  4. Confirm the firm’s current status, including whether it has been retained after reevaluation, before you list it in your bid.
  5. Keep records of your outreach in case you need to document good faith efforts.

Searching a broader or neighboring code can turn up more firms, but check that each one’s certification actually covers your scope.

Worked examples

A striping contractor. Highway line painting is an example activity under 237310, Highway, Street, and Bridge Construction. That code also covers whole road projects. A UCP would likely certify a firm that only does pavement markings under 237310 with a narrative such as “pavement marking and highway line painting only.” Its line painting counts toward the goal on a resurfacing contract. If the prime wants the same firm to install guardrail, that work counts only if the firm’s certification covers it. The firm’s size is tested against the $32.82 million cap on FHWA work, because the cap is lower than the $45 million SBA standard for 237310.

A trucking firm adding excavation. A DBE certified in 484220 hauls aggregate with dump trucks. Its five-year and three-year average receipts are both about $21 million, and it wants to add 238910 for excavation work. That is under the $34 million standard for 484220 and under the federal cap, but over the $19 million standard for 238910. The UCP decides, but on these figures the firm would likely not qualify for the new code, even though its trucking certification is unaffected. See the trucking page for how hauling codes are split.

Airport concessions (ACDBE)

Airports that receive FAA funds also run an Airport Concession DBE (ACDBE) program under 49 CFR Part 23, for businesses such as restaurants, retail shops and car rental at the airport. Part 23 has its own size standard: $56.42 million in average gross receipts over five years for most concessions, $75.23 million for passenger car rental, plus a few other exceptions. The PNW cap is $2,047,000. Concession participation also counts only when the ACDBE is certified in the appropriate NAICS code, for example 722513 Limited-Service Restaurants. The 2025 and 2026 rules apply to ACDBEs too, with the same December 24, 2026 and March 24, 2027 dates. Airport construction contracts fall under the regular Part 26 DBE program. For NAICS codes in direct federal contracting, see NAICS codes and government contracting and NAICS codes in SAM.gov.

This guide describes the regulations, not your firm’s eligibility. Your UCP decides certification and code assignments, and the recipient awarding a contract decides whether participation counts.

Sources

For a specific activity, browse the code finder and compare the official descriptions and exclusions.

First published October 27, 2026. Last reviewed October 27, 2026.

naicscodes.org is an independent reference, not a government agency. Program rules change; confirm anything you file with the agency that administers it. Spotted an error? Tell us — see our editorial policy.

Keep reading

All guides